The London Topic (Ontario, Canada) reports that PCB contaminated soil has been discovered outside the “vault” zones where reclamation work is on-going. The contaminated soils have been moved onto a polyethylene pad and covered with a PE membrane and geotextile fabric while officials meet and a public meeting is scheduled. Longer term storage and containment will be part of the site’s soil cleanup.