Another effort is being made to get General Electric to cleanup a silty, PCB-contaminated section of the Hudson River. The pollution goes back to decades of GE’s operations along the waterway. When–if–cleanup begins, dredging operations with protective turbidity curtains, dewatering bags, and contaminated water and soil collection and treatment zones will be needed.