As much as 400 feet of shoreline along Hobart, Indiana’s Lake George is crumbling due to a failed vegetation-and-rock erosion control scheme. Half has already fallen into the lake. Now a blame dispute has arisen between the design firm and the contractor. The designer has offered the park board possible solutions costing between $34,000 and $90,000, according to the article.