The latest issue of Rocky Mountain Construction includes an article on the replacement of Colorado’s oldest vehicle-traffic bridge. The $14 million project near Aspen has called for geosynthetic separation material to be installed with fill and reinforced concrete pipe as part of a temporary access point enabling construction traffic.