The geogrid-supported road redesign project in Ann Arbor, Michigan that was reported here a couple months ago has been completed. The $3.7 million, 1.3-mile-long Huron River Drive project adopted geogrid reinforcement so that the base could be shallower. This minimized slope disturbance during construction along the scenic route.