On 3 January 2012, the US Environmental Protection Agency (EPA) published a Federal Register notice requesting additional data on the performance of technologies in controlling turbidity in stormwater discharges from construction sites. The notice also requests information on other topics relevant to establishing numeric effluent limitations for stormwater discharges from these sites, including sample collection, applicability to electric transmission line construction, cold weather considerations, and the ability of small sites to meet a numeric standard. The comment period closes March 5. Simultaneously, the agency has submitted a final general permit on construction site stormwater discharges to the White House for review. This permit excludes turbidity limits. The final permit is expected by February 15.