The closed A and L Salvage site in Lisbon, Ohio is nearly capped. With about 25 percent of the synthetic membrane or plastic cap in place, the 42-acre project is expected to be finished by the end of October. In addition to the 40-mil geomembrane, 18 inches of dirt and grass will cover the hillside with elevations between 80 to 100 feet.