A storage system was required to retain 91 cubic metres of stormwater runoff for a parking
lot. Due to space restrictions at this Mount Albert, Ontario site, a stormwater management pond was not feasible. The solution? A total of 73 Triton S-29 chambers were supplied by Terrafix and installed in less than a day with overall installation (excavation, stone placement,
chamber installation, backfilling) taking less than a week to complete.