Writing for HydroReview, Chuck Cooper notes that while more hydropower projects are being designed and constructed using plastic pipe, most dam designers have never been trained on the behavior of plastics. In these constructions, designers must make decisions on the use of plastic pipe by weighing the cost, operating requirements, dependability, and long-term performance.