Contractors are breaking ground on the long-awaited fourth bore of the Caldecott Tunnel, a three-year project to relieve traffic congestion in the Oakland, California area. After multiple small tunnel stretches are excavated and reinforced, crews will finish the walls and ceiling by installing a geosynthetic liner to capture drainage water and then add a thick concrete layer reinforced with rebar.