Vector Engineering, has expanded its central geotechnical laboratory, which services the mining and solid waste sectors. The major addition involves a new loading system for testing pipe deflection and geomembrane liner puncturing. Vector’s lab can now simulate heap heights exceeding 200 meters. Also, Vector has increased the load capactiy of its large scale direct shear apparatuses to 200 psi, almost twice their previous limit.